6 Commits
Author SHA1 Message Date
ja d9392447f9 doxify: inject DOX framework into AGENTS.md and update system config docs
- Inject all 10 DOX sections into root AGENTS.md (Core Contract, Read Before
  Editing, Update After Editing, Hierarchy, Child Doc Shape, Style, Closeout,
  User Preferences, Child DOX Index)
- Update ADR 0002: linux612->linux618, 575xx->580xx NVIDIA migration
- Update setup.md: kernel/driver refs to current linux618 + 580xx
- Update stack.md, hardware-inventory.md: NVIDIA note 595.71->580xx
- Update manual-overrides.md: add br_vm_internal bridge deletion entry
- Update workstation-health.md: add Recent Cleanup section
- Update README.md: current software versions, expand roles list
- Add docs/neovim-cheatsheet.md
- Bump last_updated to 2026-06-17 on all modified docs
2026-06-17 14:13:34 +02:00
ja 9d06a71f71 feat: migrate from SDDM to greetd+tuigreet
- Add greetd role with tuigreet greeter (3 packages, 4.9MB)
- Replace SDDM as display-manager.service with greetd
- Add ADR 0003 documenting migration rationale
- Rename hyprland task: "register session in SDDM" -> "register
  Wayland session desktop entry"
- Add display_manager variables to vars/main.yml
- Add greetd role to workstation.yml
- Update setup.md timestamp
2026-05-20 12:51:25 +02:00
jaandJunie cdb0730280 docs: update hardware/setup docs and add install script
Co-authored-by: Junie <junie@jetbrains.com>
2026-05-20 10:49:07 +02:00
ja 6dbe59e117 docs: align with satware AG best practices
- Delete deprecated CLAUDE.md
- Create root-level AGENTS.md for AI assistant guidance
- Create SDD constitution in .specify/memory/constitution.md
- Align documentation with PARA structure (docs/product/project-brief.md, docs/tech/stack.md, docs/plans/)
- Add standardized YAML frontmatter to all documentation files
- Update README.md with saTway branding and structure
2026-03-09 11:02:17 +01:00
ja 51b5afc8b4 feat(workstation): complete software cleanup and project organization
- Synchronized Ansible roles with removed redundant packages.
- Performed system audit (performance, boot, disk usage).
- Organized home directory by removing 22 clean remote repositories.
- Reclaimed ~21GB of disk space in ~/Projects.
- Retained dirty repositories and those without remote origins for safety.
- Updated documentation (performance tuning, software stack, setup).
- Created NEXT_STEPS.md and documented learnings.
2026-02-27 18:07:54 +01:00
ja 264cd31ce6 feat: initial infrastructure baseline 2026-02-27 16:20:37 +01:00